JumpMat Pro

From £993.95

Woman standing on a black rectangular mat sensor at a trade show while a man with a tablet observes, signage reads "JUMPMAT".
Two tablets showing JumpMat Pro app screens with blue arrows and labels: 'Customise your test parameters', 'Live Instructions', 'Live Feedback'.
Progress chart comparing jump flight times with lines labeled 21/01/18 01:19:24 and 07/01/18 01:19:24 for user Michael M, weight 70 Kg.
£993.95(inc VAT: £1,192.74) x1
  • Can be used anywhere. It has been validated to work reliably whether indoors or outdoors
  • No need for external power and weighing under 1 kg
  • Can be carried anywhere easily with carrying bag included
  • Tested by independent academic research and has proven to be accurate within 5mm of a Force Plate
  •  Connect your device via Bluetooth connection,  simply download the App from the App/Play store
  • Proven at the highest level across a wide variety of sports & professional athletes
  • Download the product datasheet here

SKU: JUMPMAT

Product Description

Every athlete and sportsperson wants to know that they are getting stronger, faster and more powerful.

Every coach wants to ensure that their training programmes are directly benefiting every member on the team.

FSL has developed a revolutionary training aid designed to measure and enhance an athlete’s performance and to give them and their coach immediate feedback on their performance in training.

Accompanied by our unique App, the JumpMat has the ability to store, analyse, export, and present athletic data so you don’t have too! Through the use of timeline graphs and over 24 Jump Modes, you will be able to create your very own reports to show the effectiveness of your training programmes.

Athletes can create their own password-protected user accounts, where they can test and store data for review, or export data in order for them to conduct tailored in-depth analysis.

Jumpmat has proven its contribution at every level of the sport. Used by Champions, affordable to all.

Loading...
JumpMat Pro - Electronic Systems - Athletics Direct